Choose the work your project needs, not work your team already has covered.
RSG and RVP Solutions offer three defined levels, from final construction cleaning to coordinated opening support. Each level builds on the previous one. The proposal identifies the responsible company, included areas and equipment, schedule, completion records and acceptance process.
Final construction cleaning
Closeout Clean
Final construction cleaning, quality checks, and completion records.
Final cleaning of agreed areas and surfaces after release for work.
Quality checks and correction of our deficient work under agreed acceptance terms.
Completion records identifying finished work and unresolved exceptions.
For projects that need a documented final clean, with clinical cleaning arranged separately where required.
Adds clinical cleaning
Clinical Turnover
Closeout Clean plus healthcare terminal cleaning and disinfection, documented inspections, and a defined handoff.
Terminal cleaning and disinfection of agreed clinical areas using approved methods.
Documented inspections, cleaning records and visible exceptions.
A defined handoff to the named facility or project representative.
For projects that need clinical-area cleaning and documented turnover beyond the final construction clean.
Adds opening support
Activation Assurance
Clinical Turnover plus readiness coordination, cleaning of agreed noncritical medical equipment, and scheduled opening support.
Readiness coordination with named responsibilities, dependencies and issue tracking.
Cleaning of approved noncritical equipment, following device instructions and facility policy.
Opening support within a defined schedule, staffing plan and agreed scope.
For projects that need coordinated cleaning, equipment and handoff support as opening approaches.
Agree on the handoff before work starts.
Confirm area release, the equipment list, approved cleaning methods, inspection criteria, acceptance authority and the scheduled support window. Extra phases, trade re-entry, third-party recontamination and support outside the agreed window require separate scope and authorization. Pricing and mobilization are confirmed after project and capacity review.
RSG and RVP are separate companies. The agreement identifies each company's responsibilities; a combined service description does not extend one company's credentials or contractual authority to the other.
Handoff timeline
From agreed scope to handoff
For Closeout Clean, follow these five milestones for the agreed final construction clean. Clinical cleaning, noncritical equipment cleaning and scheduled opening support are not included in this level.
01
Agree scope
The buyer and contracted company agree on areas, surfaces, acceptance criteria and who receives the records.
Record: Approved scope and acceptance terms.
02
Release the area
The authorized project or facility lead releases agreed areas for cleaning and confirms safe access. This is not clinical release.
Record: Area release and access limits.
03
Final clean
The contracted cleaning team completes final construction cleaning of the released areas and surfaces. Arrange clinical cleaning separately where required.
Record: Completed work by area.
04
Check and correct
The cleaning supervisor checks the work against agreed criteria, corrects the contractor’s own deficient work and rechecks it. Record unresolved exceptions.
Record: Quality checks, corrections and open items.
05
Deliver records
The cleaning lead gives the named representative the completion record, including unresolved exceptions. The representative follows the agreed acceptance process.
Record: Dated completion and exception record.
A cleaning handoff is not permission to open. Clinical release, occupancy, commissioning and regulatory decisions remain with the responsible authorities. Trade re-entry or recontamination may require separate authorization. Extra phases, trade re-entry or third-party recontamination require separate scope and authorization; this is not general punch-list coverage.
The work
What we can cover.
Phased rough and final cleaning for construction and renovation
Terminal cleaning before activation where included in scope
Coordination with infection control risk assessment requirements
Punch-list response and turnover documentation
The record
What gets defined.
A milestone-based cleaning and staffing plan
Defined area boundaries and access requirements
Documented completion and exception lists
Coordinated handoff to facility and infection prevention leadership